Figure out how to stop consumption of Component packed in HU against manufacturing Order(MO) in RF Figure out how to stop consumption reversal of a component packed in HU against MO in RF Synopsis: A TECO status is generally put in Manufacturing order once production life cycle has come to an end and no further....

Background: After SAP implementation, one of the very common issues from the business is about storage location authorization. When business having multiple storage location for same material, business expect to consume the stock from defined storage location but in SAP, system allows the user to post the stock from any storage location even though storage....

In Std SAP we have many pre configured migration object which you can get it from here, https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/d3a3eb7caa1842858bf0372e17ad3909/8dd142b479f9481891fa8b3f86648df3.html In this blogs  I will sharing process or steps are involved in data migration in S/4HANA by using staging tables also will try to write blogs for all PP master data’s like in further blogs, Bill of....

In today’s fast-paced manufacturing environment, staying ahead of the competition requires embracing advanced technologies that can streamline processes, increase efficiency, and optimize production. One such technology is object detection, which has the potential to revolutionize the manufacturing sector. In this blog post, we will use YOLOv8, an object detection algorithm, in conjunction with SAP Digital....

Hope all doing well, After long time I am writing this blogs to give you all insights about Planning result valuation in Pegged requirement report (MD09). Basically MRP calculation will be complex formula also will be multiple source of data as it was taking data from different applications area like sales order, Purchase order and....

Today, I would like to highlight S4H 2022 changes / addition in SAP e-PPDS. Calculating multilevel time buffers for components to fulfil customer demand   Provide decision support for multilevel planning by calculation and visualization of time buffers in multitier supply chains: Calculate time-buffer information on order and operation level regarding its predecessor, successor, and....

Welcome to the next blog. In the last blog we focused on creation of manufacturing bill of material. If you have missed it please find the link below. Conversion of Engineering BOM to Manufacturing BOM (VEMP) | SAP Blogs In this blog we will discuss about Shop floor routing. Shop floor routing usage and concept....

Purpose: Purpose of this blogpost for understanding about baseline SAP PP Configuration steps of S4Hana, this blog consists of a comprehensive configuration screenshots of Production Planning, based on SAP S4Hana. Use: Baseline SAP PP configuration to execute manufacturing transactions for business run without any hassle. The configuration steps have mappings to corresponding menu path to where the....

Purpose: understanding about difference between MRP and MPS. This question we often get from business / peoples because there are few key differences between MRP & MPS. MRP: The planned and the exact requirement quantities trigger the net requirements calculation. The requirement elements of this calculation include sales orders, planned independent requirements, material reservations, dependent requirements received from BOM....

Hello all and welcome to yet another Blog. Here I will be mentioning a few prospects and functionality of Buyoffs, why is it so important and how it can be used. In SAP PEO, we have an additional functionality as Buyoffs. Buyoffs are an additional step for the confirmation of an activity.   As mentioned....

Let’s start with a new series of Blogs to know about the objects and functions of SAP PEO, its features and usability. For SAP PEO the main highlight that makes it different is, the use of Version BOMs instead of normal BOMs. Version BOM’s key aspects needs to be understood before getting into further details. Version BOMs....

Welcome again to the series. In the previous post I had illustrated how we can create EBOM. Version Bill of Material creation ´(SAP PEO) | SAP Blogs After the creation of the EBOM, it is converted into a version controlled manufacturing BOM so that the production of the product can be started. Manufacturing BOM is....

Edge computing today is one of industry’s most promising technology opportunities. Used in production by just over a quarter of manufacturers, it’s a tool that is expected to be trialed by more than half of U.S based manufacturing firms within the next two years. As a technology with revolutionary potential, it’s one that every manufacturer,....

This document aims to provide detailed step by step implementing fast entry of characteristics in Order Confirmation. This document encompasses screenshots of the steps to be followed. Characteristics value assignment of a batch class in production process is essentially important for a product where the product holds a batch specification. Using fast entry of characteristics,....

Over the past 2 years the risks and shortfalls in our global supply chains have been front and center in presidential briefing rooms, company boardrooms, and even family dining rooms. Supply chains are now recognized as central to business survival, success, and growth, rather than an opportunity to just reduce costs. As we head into....

Hello Manufacturing experts, Here I am going to explain the sub-Item concept in BOM. Sub Item is not a component it just represents the position where component to be installed in Assembly /Sub assembly that means the subitem help you to identify exactly, where to use (to put) the material in your product or in the production....

Hi, This blog is to explain functionality of PP optimizer in S/4 HANA 2020 PPDS, its limitations and SAP recommendations to use PP optimizer in S/4 HANA 2020 What is Production Planning Optimizer optimization or PP Optimizer? PPO is to integrates purchasing, manufacturing, and distribution so that comprehensive tactical planning and sourcing decisions can be....