In this blogpost, we will review the pre-requisites that must be taken into account while implementing SAP S/4HANA Manufacturing for Planning and Scheduling side by side to an SAP ERP or SAP S/4HANA on-premise system.
In this scenario, advanced production planning would run on the DSC edition while production execution will happen on the on-premise ERP or S/4HANA system using core Production Planning (PP) module. To implement this scenario, there are certain pre-requisites that must be taken care of. They are as follows:
1. System Considerations
As ERP system, the following systems can be used:
- SAP S/4HANA 2020 FPS1 with SAP Note 3020852 or higher
- SAP S/4HANA 1909 with support package 6 or higher or SAP Note 3126428
- SAP Enhancement Package 7 for ERP 6.0 with support package 23 or SAP Note 3004711
- SAP Enhancement Package 8 for ERP 6.0 with support package 17 or SAP Note 3004711
As PP/DS system, you can use SAP S/4HANA 2020 FPS1 or higher with SAP Note 3020852
2. SAP liveCache
The SAP liveCache is installed for the PP/DS system. For more information, see SAP Note 2407589.
3. PP/DS Optimizer (optional)
An optimizer is installed for the PP/DS system. For more information, see SAP Notes 1686826 and 712066
4. RFC Users
Before any customizing activity can be done, check that an RFC user exists in each system/client that is used.
Roles
System Type | Release | Technical Name of Role | Comment |
ERP system (for CIF Outbound) | SAP Enhancement Package 7 for ERP 6.0 | SAP_SCM_INTEGRATION_DIMP | See SAP Note 727839. |
ERP system (for CIF Outbound) | SAP Enhancement Package 8 for ERP 6.0 | SAP_SCM_2_ERP_Integration | See SAP Note 2081387 |
ERP system (for CIF Outbound) | SAP S/4HANA 1909 or higher | SAP_SCM_2_ERP_Integration | See SAP Note 2081387 |
PP/DS system (for CIF inbound) | SAP S/4HANA 2020 | SAP_SCM_Integration_2 | See SAP Note 3061830. |
In conclusion, prior to configuration, integration setup for master data and integration could begin – these pre-requisites must be considered. For the complete implementation guide for running advanced planning side by side on the DSC edition, please see note 2997719 – Restrictions and Implementation Recommendations for Using Advanced Planning Side-by-Side with an ERP System.