In this blogpost, we will review the pre-requisites that must be taken into account while implementing SAP S/4HANA Manufacturing for Planning and Scheduling side by side to an SAP ERP or SAP S/4HANA on-premise system.

In this scenario, advanced production planning would run on the DSC edition while production execution will happen on the on-premise ERP or S/4HANA system using core Production Planning (PP) module. To implement this scenario, there are certain pre-requisites that must be taken care of. They are as follows:

1. System Considerations

As ERP system, the following systems can be used:

  • SAP S/4HANA 2020 FPS1 with SAP Note 3020852 or higher
  • SAP S/4HANA 1909 with support package 6 or higher or SAP Note 3126428
  • SAP Enhancement Package 7 for ERP 6.0 with support package 23 or SAP Note 3004711
  • SAP Enhancement Package 8 for ERP 6.0 with support package 17 or SAP Note 3004711

As PP/DS system, you can use SAP S/4HANA 2020 FPS1 or higher with SAP Note 3020852

2. SAP liveCache

The SAP liveCache is installed for the PP/DS system. For more information, see SAP Note 2407589.

3. PP/DS Optimizer (optional)

An optimizer is installed for the PP/DS system. For more information, see SAP Notes 1686826 and 712066

4. RFC Users

Before any customizing activity can be done, check that an RFC user exists in each system/client that is used.

Roles

System Type Release Technical Name of Role Comment
ERP system (for CIF Outbound) SAP Enhancement Package 7 for ERP 6.0 SAP_SCM_INTEGRATION_DIMP See SAP Note 727839.
ERP system (for CIF Outbound) SAP Enhancement Package 8 for ERP 6.0 SAP_SCM_2_ERP_Integration See SAP Note 2081387
ERP system (for CIF Outbound) SAP S/4HANA 1909 or higher SAP_SCM_2_ERP_Integration See SAP Note 2081387
PP/DS system (for CIF inbound) SAP S/4HANA 2020 SAP_SCM_Integration_2 See SAP Note 3061830.

In conclusion, prior to configuration, integration setup for master data and integration could begin – these pre-requisites must be considered. For the complete implementation guide for running advanced planning side by side on the DSC edition, please see note 2997719 – Restrictions and Implementation Recommendations for Using Advanced Planning Side-by-Side with an ERP System.

Sara Sampaio

Sara Sampaio

Author Since: March 10, 2022

0 0 votes
Article Rating
Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x